Inverter Replacement Services – Quote
Description
Labor Services for the Replacement of inverter includes up to 2 per order and the following:
- Standard 1 year for workmanship
- Decommission System
- Remove and Dispose of Old Inverter(s)
- Inspect all string DC electrical connections
- Inspect all AC conductors
- Install new mechanical components for hanging of inverter
- Install all new fusing
- Commission inverter with correct configurations
- Measure production and compare data
- Make and test communications connections
- If DOA unit under warranty and RMA will be initiated with manufacturer
- Field service report is included after visit
- Next steps are described if required
- MONITORING SYSTEM:
- Real Time Production Data
- Historical Production Data
- Inverter Comparison (If multiple inverters)
- Weather data
- Reimbursement Estimate
- (2) SMA 5000 Inverters/10 Year Manufacturers Warranty
- *REMOVAL AND INSTALLATION ESTIMATED TO TAKE 1 DAY
- *POWER TO SITE WILL NOT BE LOST WHILE ON SITE
- *50% DEPOSIT VIA CREDIT CARD DUE AT SIGNING -BALANCE TO BE PAID ON DAY OF SERVICE
Note: Man lift equipment may be needed (charged separately)